Comprehensive Integration – Full Assessment and Optimized Planning for Cooling, Heating, and Waste Heat Management
Leveraging advanced AI technology, precise control of HVAC valves is achieved, enabling temperature regulation within ±0.1–0.5°C. Even at low loads down to 10%, the HGBP technology ensures stable operation of the chiller, achieving maximum overall COP efficiency.
Simultaneous Cooling and Heating Needs:
For facilities such as hotels and hospitals, TECO provides permanent magnet screw chiller heat pump units that supply both chilled and hot water. Through heat recovery technology, the overall system COP is maximized.
Constant Temperature and Humidity Requirements:
For manufacturing and electronics facilities, TECO’s permanent magnet screw chiller heat pump units replace high-energy-consuming devices such as electric heaters and boilers. This significantly reduces overall energy consumption, achieves balanced cooling
and heating, meets precise environmental requirements, lowers operational costs, reduces carbon emissions, and minimizes capital expenditure.
Core Advantages
AHRI Ready
Free assessment, customized solutions, and one-stop ESCO services.
40–180 ℃ heat pump, dual cooling and heating, suitable for diverse applications.
Comprehensive solutions with deep integration to enhance energy-saving efficiency.
Assist in applying for energy-saving subsidies, reducing operational costs, and increasing ESG benefits for owners.
Precise Temperature Control for Stable Process Quality
Large temperature differential with low flow rate
Maintains stable operation of the chiller even at loads as low as 10% using HGBP technology
Projects
Products
Applications
Contact Us
Chuo Wen-heng
Factory Process Heating & Cooling
- gu2262@teco.com.tw
- +886-2-26553333 #1341