Waste Management
Waste Management Plans |
2023 Actions |
---|---|
Waste audits to identify opportunities for improving waste performance |
TECO follows the ISO 14001 environmental management system and internal management procedures to take inventory of waste disposal every year, further evaluates the hot spots of waste generation based on operating locations, waste composition, and treatment methods, and plans relevant reduction measures. |
Action plans to reduce waste generation |
TECO's operating plants manage waste declaration, storage, removal, treatment and reuse in accordance with various waste management regulations. |
Quantified targets to minimize waste |
In 2023, management is carried out with the goal of reducing the amount of waste generated in the factory by 2% annually. The data coverage rate reaches 84.6%. |
Investment in innovation or R&D to minimize waste |
TECO has invested in circular economy, including continuous investment in research and development in the factory to continuously improve silicon steel chip melting technology. |
Waste reduction training provided to employees |
TECO conducted waste reduction (environmental education)-related training for waste management personnel at production bases, with a total number of 2,005 people, totaling 3,466.35 hours. |
Integration of recycling programs to reduce the waste sent to landfill |
TECO follows the "Waste Storage and Removal Management Measures" to reduce the chance of waste entering landfills. The weight of waste reused and recycled in 2023 will account for more than 90% of the total waste weight. |
Waste diversion from landfill is certified by an independent accredited body |
TECO entrusts local government-qualified removal and treatment vendors with waste removal, treatment, and burial in various regions, and the waste transfer is confirmed by contract. The weight data of each waste treatment process has been verified by a third party. The waste diversion rate in 2023 has reached above 95% |
Formulate the “Waste Storage and Clearance Management Measures” and environmental management measures related to waste in the factory area, strengthen the tracking of waste removal and disposal, and hold meetings to review from time to time in accordance with laws and regulations. When selecting a waste treatment supplier, TECO conducts on-site evaluation on treatment capacity and the relevant acceptance standards to strengthen the tracking and management of waste removal and treatment.
General Waste
Total waste recycled |
12526.55 |
15340.87 |
12027.48 |
14100.44 |
Total waste disposed |
1000.24 |
724.22 |
859.64 |
946.89 |
Waste landfilled |
|
215.34 |
192.42 |
39.01 |
Waste incinerated with energy |
|
|
342.66 |
733.05 |
Waste incinerated without energy recovery |
|
468.68 |
280.72 |
115.99 |
Waste otherwise disposed |
|
40.2 |
43.84 |
58.84 |
Waste with unknown disposal method |
1000.24 |
|
|
|
Coverage |
79.70% |
89.50% |
80.30% |
84.60% |
Unit: metric tons 2023 Target: Treatment 966 ton
Hazardous Waste
Total hazardous waste recycled |
0 |
536.253 |
599.28 |
602.35 |
Total hazardous waste disposed |
731.55 |
336.16 |
294.92 |
286.27 |
Waste landfilled |
|
3.371 |
0.129 |
0.073 |
Waste incinerated with energy |
|
|
|
206.474 |
Waste incinerated without energy recovery |
|
280.074 |
237.267 |
31.953 |
Waste otherwise disposed |
|
10.39 |
10.4 |
0.706 |
Waste with unknown disposal method |
731.55 |
42.322 |
47.064 |
47.07 |
Coverage |
79.70% |
89.50% |
80.30% |
84.60% |
Unit: metric tons 2023 Target: 292 ton
Due to the different definitions of hazardous waste in different countries, from 2021 onwards, when expanding the recognition of the Italian factory, the calculation will be based on EU standards, and the data was traced back to 2020 retroactively. This resulted in an increase in the group-wide hazardous waste value. The waste oil, grinding sludge, coolant emulsions, aqueous washing solution, contaminated packaging, contaminated filters and absorbents, and exhausted wheels of the Italian factory are all recognized as hazardous wastes, but such wastes are recognized as non-hazardous general business waste in other countries.
Total waste disposal weight |
General Waste |
Hazardous Waste |
---|---|---|
Reuse and recycling |
14,100.44 |
602.35 |
Incineration |
Energy recovery: 733.06 Non-energy recovery: 115.99 |
Energy recovery (steam): 206.47 Non-energy recovery: 31.95 |
Bury |
39.01 |
0.07 |
Other |
Physical treatment: 34.51 Heat treatment: 24.33 |
Physical process: 0.71 Waste inert: 47.07 |
Unit: metric tons
The total amount of waste broken down by component in 2023 is 17,595.81 metric tons
The factory targets an annual reduction of 2%. The data coverage rate reaches 84.6%. Waste removal, treatment, and burial in each region are entrusted to qualified local government processors, and the contract confirms that the waste transfer has been certified by a third party.
Pollution Prevention and Control
Air pollutants are mainly generated during motor production in the Chungli plant and consist mainly of Volatile Organic Compounds (VOCs). TECO has implemented improvements at the source by replacing the base coat for motors with VOC-free water-based paint. Air pollution control facilities have been established in accordance with the relevant laws and standards and dedicated personnel have been assigned to carry out operations in accordance with environmental protection-related laws. Pollutant categories include SOx, NOx, PM and VOCs. TECO is firmly committed to reducing pollutant concentrations to conform to air pollution standards.
Volatile organic compounds (VOCS) |
200.77 |
179.7 |
136.7 |
110.4 |
Coverage |
78.5% |
89.5% |
80.3% |
84.6% |
2023 Target: Treatment 123 ton
Nitrogen oxide (NOX) |
1.99 |
1.53 |
0.92 |
1.62 |
Sulfur oxide (SOX) |
1.62 |
1.77 |
1.02 |
1.99 |
Coverage |
78.5% |
89.5% |
80.3% |
84.6% |